Lake Meredith: 41.8% full as of 2020-02-21

Lake Meredith is governed by the Canadian River Compact. The States of New Mexico, Texas and Oklahoma are all parties to the compact created by agreement of the three states and the federal government in 1950. According to the compact, New Mexico can hold 200,000 acre-feet in Ute Lake before it has to release water to Texas. Texas also can only hold 500,000 acre-feet in Lake Meredith before it has to release water for Oklahoma. The elevation-storage rating curve used to produce the storage hydrograph is made of two segments: (1) the segment up to the conservation pool top (below the red line) is based on measured data, and (2) the segment in the flood pool (above the red line) is an extrapolation from the first segment and shouldn't be relied upon for flood storage information.

Historical Data

Date Percent Full Mean Water Level
(ft)
Reservoir Storage
(acre-ft)
Conservation Storage
(acre-ft)
Conservation Capacity
(acre-ft)
Surface Area
(acres)
Today 2020-02-21 41.8 2,889.72 247,607 209,193 500,000 7,463
Yesterday 2020-02-20 41.8 2,889.71 247,532 209,118 500,000 7,461
2 days ago 2020-02-19 41.9 2,889.74 247,756 209,342 500,000 7,466
1 week ago 2020-02-14 41.9 2,889.75 247,831 209,417 500,000 7,468
1 month ago 2020-01-21 41.9 2,889.73 247,681 209,267 500,000 7,465
3 months ago 2019-11-21 41.4 2,889.45 245,597 207,183 500,000 7,422
6 months ago 2019-08-21 40.8 2,889.01 242,345 203,931 500,000 7,360
1 year ago 2019-02-21 38.2 2,887.20 229,283 190,869 500,000 7,099
*

Percent Full is based on Conservation Storage and Conservation Capacity and doesn't account for storage in flood pool.

**

   Values above, including today's are averaged conditions. For near real-time instantaneous water level, see table below or the interactive map viewer.

Most Recent Instantaneous Water Level

Date/time Water Level
(ft)
Conservation Pool Elevation
(ft)
Height Above Conservation Pool
(ft)
Most recent 2020-02-21 11:30 2,889.75 2,936.50 -46.75 below flood pool
1 hour prior 2020-02-21 10:30 2,889.75 2,936.50 -46.75 below flood pool
2 hours prior 2020-02-21 09:30 2,889.75 2,936.50 -46.75 below flood pool
6 hours prior 2020-02-21 05:30 2,889.72 2,936.50 -46.78 below flood pool
12 hours prior 2020-02-20 23:30 2,889.72 2,936.50 -46.78 below flood pool
24 hours prior 2020-02-20 11:30 2,889.71 2,936.50 -46.79 below flood pool
48 hours prior 2020-02-19 11:30 2,889.75 2,936.50 -46.75 below flood pool
*

Data is provisional and subject to revision.

Additional Information

Impoundment date 1965-01-01
Vertical datum NGVD29
Gauge USGS:07227900
Dead pool elevation 2,850.00 ft above NGVD29
Service spillway crest elevation 2,965.00 ft above NGVD29
Maximum design elevation 3,004.90 ft above NGVD29
Top of dam elevation 3,011.00 ft above NGVD29
Conservation pool elevation 2,936.50 ft above NGVD29
Data download (CSV) period of record, last one year, last 30 days

Elevation-Area-Capacity Curves

1980-01-01 (source: usbr)
1995-06-01 (source: twdb) : GIS Data